Infraestructure Parque Industrial Zeta Cartago |
|
ELECTRICAL INFRAESTRUCTURE The park is supplied by three different feeders from the Electrical Utility Companies: - The main feeder is connected directly to the Main HV Substation at the Generator Site RIO MACHO (12 MW power capacity). - The second feeder is connected to a secondary substation thru a MV Switch (electronic type). It feeder is named ZETA because it serves the park directly (24 MW power capacity). - The third feeder (CERRILLOS) is connected to Cerrillos distribution line (24 MW power capacity).
PHONE AND DATA
The park has a Main Switchboard Telecommunication Building (MSTB). This MSTB belongs to the Instituto Costarricense de Electricidad (ICE). ICE can deliver telephone, data and internet connection services.
Second telecom provider is Radiográfica Costarricense S.A. (RACSA). RACSA also has a switchboard inside the park and it mainly provides internet broadband services.
Fiber optic rings connected to the park:
ν One ring of 155 Mbps supported by ICE ν Second ring of 100 Mbps supported by RACSA
Telecom services inside the park:
ν Int’l & local dedicated lines ν Internet lines (T1, E1 and DS3) ν ISDN ν ADSL ν Video conference ν Telephone lines (ICE) ν Remote monitored data assistance (ICE)
Potable water
The potable water service is supplied by the Cartago local government (Municipalidad de Cartago).
Additionally, the park has its own a water storage system to serve us as a back up. This system consist of two elevated storage tanks with a capacity of 45 square meters each, and an underground storage tank of 225 square meters of capacity for a total of 315 square meters.
Also, in order to support the main potable water system there is water well with a flow capacity of 15 litters / second.
|